GLOBAL GREEN POWER3225 Oberlin Lubbock, TX 79415
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Completion of Final Report and Gas Analysis for a Biomass Gasifier Submitted in partial fulfillment of Contract 55018a of the Western Regional Biomass Energy Program Contract beginning date: September 30, 1999 Contract ending date: December 31, 2001 Joe D. Craig, Principal Investigator Cratech, Inc. P.O. Box 70 Tahoka, Texas 79373 (806) 327-5220 Table of Contents List of Figures............................ ii List of Tables............................. ii ABSTRACT............................... iii EXECUTIVE SUMMARY....................... iiii
REFERENCES............................ 15 ACKNOWLEDGEMENTS........................ 15 APPENDIX: Biomass Gas Sampling and Analysis.............. 16 Biomass Gas Sampling and Analysis 1.0 PROJECT OBJECTIVES AND ORGANIZATION 1 1 2.0 EXPERIMENTAL APPROACH 2 1 3.0 SAMPLING AND ANALYSIS PROCEDURES 3 1 3.1.1 Particulate and Metals 3 1 3.1.3 Continuous Emission Monitors 3 2 4.1 Bias, Precision and Completeness 4 1 5.0 DATA REDUCTION, VALIDATION, AND REPORTING 5 1 Figure 1-1. Project Organization 1 2 Figure 2-1. Test Facility 2 2
Figure 1. Cratech Phase 2 Gasification System............... 2 Figure 2. Completed Phase 2 Gasification System: Feeder End View..... 3 Figure 3. Completed Phase 2 Gasification System: Filter End View....... 4 Figure 4. Performance of the Gasification System during One of the Commissioning Runs.................... 5 Figure 5. Feeding Biomass into Process.................. 7 Figure 6. Flaring Produced Gas.................... 7 Figure 7. Wood Used for Fuel...................... 8 Figure 8. Cotton Gin Trash Used for Fuel................ 8 Figure 9. Gas Chromatograph in Operation................. 9 Figure 10. Particle Filter........................ 9 Figure 11. Impinger Data Collection.................... 9 Figure 12. Set of Sampling Impingers.................. 9 Figure 13. Gasification Process Performance................ 11 Figure 14. Composition of the Produced Gas as Measured by the CEM..... 12 Figure 15. Composition of the Produced Gas as Measured by the CG...... 13
Table 1. Proximate, Ultimate and Mineral Analysis of the Wood Used During Runs.. 7 Table 2. Proximate, Ultimate and Mineral Analysis of the Cotton Gin Trash Used During Runs.......................... 8 Table 3. Summary of Gas Analysis.................... 14
A new generation of small-scale (less than 20 MWe) biomass fueled power plants are being developed based on a gas turbine prime mover. These power plants are expected to increase the efficiency and lower the cost of generating power from fuels such as wood. The development of this technology is being carried out in three phases. This report covers much of the phase 2 development effort. The goal of phase 2 is to complete a gasification system capable of fueling a 1 MWe gas turbine engine. This report includes description of the pressurized fluidized bed gasification system, the general performance of the system, the gas molecular content and the solid particle and alkali metal concentration of the produced gas.
There is a great desire by many individuals and entities worldwide to convert the energy contained in indigenous biomass resources to useful forms of fuel and power at a cost that is competitive with non-renewable energy resources and with a responsible stewards view toward the environment. This is an immense and exciting challenge. Without further elaboration, Cratechs sole focus is to develop processes and products to meet this challenge. There are several technical challenges to overcome before economical small scale (1 to 20 MWe) biomass fueled power plants can become commercial reality. Figure 1 shows a schematic of a biomass-fueled integrated-gasifier gas turbine (biomass fueled IGGT) power plant. This is the path Cratech has chosen to provide the enabling technology to meet this market need. The technology is being developed in 3 phases. These phases are: Phase 1: Biomass feed rate of 500 kg per hour at 2 bara (2 bar absolute) pressure including a slipstream flow hot gas cleanup system. Phase 2: Biomass feed rate of 1000 kg per hour at 10 bara pressure including a full flow hot gas cleanup system. Phase 3: Integrate the phase 2 system with a modified gas turbine engine. Phase 1 of this development program is complete and is reported in (Craig, 1996). This report covers the progress made towards completion of Phases 2 and 3.
Figure 1. Cratech Phase 2 Gasification System Design and construction of the phase 2 gasification system was completed. A series of operating runs were made to commission the system. Following the commissioning runs the system was declared ready for performance and gas emissions testing. A gas test plan was prepared in cooperation with the US EPA. During June 2001 the gas test plan was completed. The system was operated for a total of 65 hours to complete the test plan including one continuous run of 45 hours. The system was operated at a pressure of 2 bara at a temperature of 760o C using two different fuels. The performance parameters of the system were recorded. The gas produced was sampled for molecular composition and ash particulate and alkali metal concentration. In addition, a study was completed to select a favorable site for the first commercial demonstration (beta test site) of the Cratech biomass power process. Work was also carried out towards completing phase 3. A gas turbine was procured and modifications were begun but further progress was put on hold due to lack of funding. Following are reports on each of the completed tasks. 3.1 Task 1: Report on phase 2 and phase 3 progress made under contract 55018 Construction of the phase 2 gasification system was completed and a series of low pressure (2 bara) commissioning runs were conducted beginning in April, 2000. A schematic of the system is shown in figure 1. Photos of the completed gasification system are shown in figures 2 and 3.
Figure 2. Completed Phase 2 Gasification System: Feeder End View
Figure 3. Completed Phase 2 Gasification System: Filter End View
The phase 2 system is rated to gasify 1000 kg/hr of biomass at a temperature of 760 oC and a pressure of 14 bara. The system was not operated at a pressure greater than 2 bara because the rated pressure capacity of the air compressor was limited. Following biomass gasification in the fluidized bed reactor the produced gas is processed through a hot gas filter at the given temperature and pressure. The commissioning run time totaled 63 hours. The gasification system was declared ready for a long term (up to100 hour) performance and gas analysis run. Wood was used for fuel during the commissioning runs (see table 1 and figure 7).
Figure 4. Performance of the Gasification System During One of the Commissioning Runs
Phase 3 included procurement and modification of a 1 MWe gas turbine genset to be fueled with the produced gas. We were not able to procure a 1 MWe gas turbine genset; however, we did obtain a 200 kWe gas turbine genset. The gas turbine genset had been in storage for several years and its enclosure was in poor shape. The turbine engine itself appeared operable and in fairly good working order. The gas turbine unit was removed from its old enclosure, cleaned and repaired. It was then successfully operated with diesel fuel. A new enclosure for the turbine was designed and constructed. A new combustor was designed for the turbine so that it could be fueled with the produced gas. A report on this work was issued (Craig, 2000). Funding became insufficient to complete all work required on the turbine genset unit. Work on the unit was placed on hold. A booster compressor will eventually be required to complete the biomass power plant. This compressor increases the pressure of the air supplied from the gas turbine engine to the gasification system (refer to figure 1, component labeled "booster compressor"). This is a major component required to properly integrate the phase 2 gasification system with the phase 3 gas turbine generator. The design and selection of this compressor was a requirement of the original contract 55018 (task 4). There were several possible choices for this compressor. The final choice was a compressor manufactured by Sundyne Corp of Arvada, Colorado.
In cooperation with the US EPA a gas test plan was prepared to test the gas produced by the phase 2 gasification system. The test plan is entitled," Biomass Gas Sampling and Analysis" and is contained in the appendix.
3.3 Task 3: Gasifier Operation and Gas Sampling The combined methods 5 and 29 gas sampling trains were prepared and set up to sample the produced gas over a maximum time period of 100 hours. The gas chromatograph and continuous emissions monitoring instruments were also set up to sample gases for a maximum time run of 100 hours. Wood was fed to the gasifier from June 01, 2001 12:00 to June 03, 2001 00:00 (see figure 7 and table 1). Cotton gin trash (CGT) was fed to the gasifier from June 03, 2001 00:00 to June 03,2001 9:00 (see figure 8 and table 2). This was a continuous test run of 45 hours. Figure 5 shows the biomass being loaded into the bulk feed hopper. Figure 6 is a photo of the resulting produced gas. The molecular composition of the gas was measured by the use of continuous emissions monitors and a gas chromatograph, see figure 9. The gas was measured for its solid particle content by use of modified EPA method 5. Method 5 uses quartz thimble filters to capture any particles entrained in the gas, see figure 10. The gas was analyzed for its alkali metal content by the use of method 29, see figures 11 and 12.
Figure 5. Feeding Biomass into Process
Figure 6 . Flaring Produced Gas
Table 1. Proximate, Ultimate and Mineral Analysis of the Wood Used During Runs (see figure 7 for photo) Proximate Analysis (as received basis) Mineral Analysis Mineral
weight % Mineral weight
%
Figure 7. Wood used for fuel, see also table 1.
Figure 8. Cotton Gin Trash used for fuel, see also table 2.
Table 2. Proximate, Ultimate and Mineral Analysis of the Cotton Gin Trash (CGT) Used During Runs (see figure 8 for photo)
Mineral weight %
Figure 9. Gas Chromatograph in Operation.
Figure 10. Particle filter
Figure 11. Impinger data collection
Figure 12. Set of Sampling Impingers The charts shown in figure 13 are the recorded general performance of the gasification system. Figure 14 are two charts showing the data recorded by the continuous emissions monitors. Figure 15 is a chart showing the data recorded by the gas chromatograph. All data given is for the 45 hour continuous run. The continuous run was interrupted by the failure of the ash rotary airlock to maintain a constant pressure. This airlock is part of the component labeled "ash depressurization" in figure 1. In an attempt to gather more data additional runs were made. This was possible by manually starting and stopping the rotary airlock. When the airlock was not rotating the ash would build up and the pressure in the system increased. An additional 20 hours of short run operation was achieved in this manner; however, no additional useful gas sampling data was achieved during these short term runs. The rotary airlock began to fail completely to maintain system pressure. The test runs were terminated.
Figure 13. Gasification Process Performance (top chart is first half of run, lower chart is second half of run)
Figure 14. Composition of the Produced Gas as measured by the CEM (top chart
is first half of run, lower chart is second half of run)
Figure 15. Composition of the Produced Gas as measured by the GC.
3.4 Task 4: Results and Conclusion of the Gas Testing The following are the analysis of the results of the testing and some conclusions drawn from analysis of the results. 3.4.1 Results Table 3 is a summary giving the solid particle concentration, alkali metal concentration and gas composition for the three wood sampling runs, 2A,3A and 3C and the two CGT runs 4A-2 and 4B. Table 3. Summary of Gas Analysis
Sampling the pressurized hot gas for its molecular composition by GC and CEM with the method described proved to be adequate. Cooling the gas for use by the instruments was not difficult except for tar condensation. The cooling apparatus had to be constantly monitored and cleaned of tars to maintain gas sampling flow. The EPA modified method 5 was very difficult to use for sampling the hot pressurized gas. The gas sampling filter and the impinges were operated under the gas sampling pressure of 2 bar (abs) and a temperature of 760 oC. The primary difficulty was assuring that the temperature of the sampling filter was maintained at the same temperature as the gas being sampled and under pressure. Following each run the sample filters seemed to be coated with a black film on the outer and inner surface (see figure 10). The filter is white in color and should remain close to this color when removed. The only agreed upon explanation for this phenomenon is that heating of the sample filter may have caused the tar vapors passing through the filter to become solidified. This problem lends considerable uncertainty to the resulting solid particle concentration data as reported in table 3. Unfortunately this also taints the reported alkali metal concentration results as shown in table 3. 3.4.2 Conclusions
Craig, Joe D. Development of a Small Scale Biomass-Fueled Integrated-Gasifier Gas Turbine Power Plant: Phase 1. Western Regional Biomass Energy Program, Golden, CO. September 24,1996. Craig, Joe D. Development of a Small Scale Biomass-Fueled Integrated-Gasifier Gas Turbine Power Plant: Phase 2 and 3. Final Report for the Western Regional Biomass Energy Program. Grant DE-FC48-97WA13475 Golden, CO. February 1, 2000.
U.S. Department of Energy, Western Regional Biomass Energy Program U.S. Environmental Protection Agency, National Risk Management Research Laboratory State of Texas, General Services Commission, State Energy Conservation Office. Texas Tech University
APPENDIX: Biomass Gas Sampling and Analysis Biomass Gas Sampling and Analysis Quality Assurance Project Plan Category IV/Basic Research
U.S. Environmental Protection Agency Air Pollution Prevention and Control Division March 2001 Contract No. 68-C99-201 Work Assignment No. 2-032 Project No. RN992012.0032 Prepared for: U.S. Environmental Protection Agency Air Pollution Prevention and Control Division Atmospheric Protection Branch Research Triangle Park, NC 27711
Research Triangle Park North Carolina 27709 QAPP March 2001
Biomass Gas Sampling and Analysis Quality Assurance Project Plan Category IV/Basic Research
U.S. Environmental Protection Agency
EPA
EPA
Signature Page Section - Page 1.0 PROJECT OBJECTIVES AND ORGANIZATION 1 1 1.1 Background 1 1 1.2 Project Objectives 1 1 1.3 Project Management 1 1 2.0 EXPERIMENTAL APPROACH 2 1 2.1 Test Facilities 2 1 3.0 SAMPLING AND ANALYSIS PROCEDURES 3 1 3.1 Sampling Methods 3 1 3.1.1 Particulate and Metals 3 1 3.1.2 GC/TCD Sampling 3 2 3.1.3 Continuous Emission Monitors 3 2 3.2 Analytical Methods 3 4 3.2.1 Particulate 3 4 3.2.2 Metals 3 4 4.0 QA/QC CHECKS 4 1 4.1 Bias, Precision and Completeness 4 1 4.2 Comparability 4 1 4.3 Internal QC Checks 4 2 4.4 Corrective Action 4 2
5.0 DATA REDUCTION, VALIDATION, AND REPORTING 5 1 5.1 General Principles 5 1 5.2 Data Reduction 5 1
6.0 References 6 1 List of Figures Section-Page Figure 1-1. Project Organization 1 2 Figure 2-1. Test Facility 2 2 List of Tables Section-Page Table 4-1. Data Quality Indicator Goals for Critical Measurements 4 3 Appendices Appendix A. Standard Methods
1.0 PROJECT OBJECTIVES AND ORGANIZATION 1.1 Background The EPA/APPCD has an interest in small-scale, biomass-fueled power plants, in particular, the molar composition and contaminants in a biomass syngas produced by a pressurized, fluid-bed gasifier and cleaned with a hot gas filter system designed to fuel a gas turbine. The gas compatibility of the syngas with a gas turbine is critical in the long-term operation of such a power plant. 1.2 Project Objectives ARCADIS will conduct sampling and monitoring to characterize the biomass-produced syngas at a pilot system owned and operated by Cratech in Tahoka, Texas. The following tasks will be performed:
The primary constituents of interest are particulate, sodium and potassium concentration, and process gas concentration (CO, CO2, O2, NOx, and methane). 1.3 Project Management Carol Purvis is the EPA/APPCD Work Assignment Manager for this project. ARCADIS personnel responsible for carrying out the project are shown in the project organization chart, Figure 1-1. Kevin Bruce is the Project Manger for the APPCD On-Site Laboratory Support contract. Russ Clayton is the Work Assignment Leader for ARCADIS with overall responsibility for task coordination, sampling supervision, data generation and analysis, and corrective action. Mr. Clayton will also be ultimately responsible for reviewing all necessary documents (test plan, safety plans, monthly progress reports, journal publications, and final reports). Gene Stephenson is the Sampling Engineer for this project. He will be responsible for sample collection and recovery, data generation, and report preparation. Mike Bowling will be a member of the field crew to assist Mr. Stephenson in testing and sampling. Laura Beach, ARCADIS QA Manager, will provide QA support including performance evaluation materials requested by EPA, QAPP review, and necessary internal audits. Category IV projects are not routinely audited unless requested by the EPA WA Manager. Jerry Revis, ARCADIS Safety Officer, will provide safety oversight of the project. Responsibility for producing quality data is shared by all staff members, and each member shares the responsibility for reporting data quality problems to the WA Manager or the QA Manager. Overall data quality will be continuously assessed in the field by the Sampling Engineer and data are reported by the ARCADIS Work Assignment Leader and the EPA Work Assignment Manager. Joe Craig of Cratech will be responsible for facility preparation and operation under subcontract.
Figure 1-1. Project Organization
2.1 Test Facilities A pilot system located in Tahoka, Texas, owned by Cratech, will be the host for this testing. The Cratech Pressurized Fluidized-Bed Gasification System is shown in Figure 2-1. The Bulk Biomass Feeder is a live-bottom screw feed hopper that is filled with biomass material using a wheeled loader. From this atmospheric pressure hopper, the biomass material is conveyed pneumatically to the Biomass Pressurization Vessel (BPV). The BPV, by use of knife gate valves, carries material batches across the barrier between atmospheric and fluidized-bed operating pressures. From the BPV, material is delivered to the top of the Meter Vessel (MV). The MV, a pressurized gravimetric feeder, under microprocessor control, meters biomass material into the top of the Reactor Vessel. The Reactor Vessel is an air-blown fluidized-bed reactor operating at up to 103 kPa and approximately 740 °C. It exhausts into the Receiver Vessel and Ash Cooling and Removal System for large particle and ash depressurization and removal. The Receiver Vessel is essentially a pressure surge tank and manifold which conveys most of the product gas (~95%) to the Flare through the Hot Gas Pressure Regulator Valve (which is the primary system pressure regulator); the remaining 5% is conveyed to the Hot-Gas Filter Vessel (HGFV) for fine particle removal. The HGFV uses sintered metal filters to remove all particles 2.8 μm in diameter and larger. The product gas volume and quality are measured in the Gas Flare Proximate Calorimeter. The particulate gas train tap will be between the HGFV and the calorimeter. The Control and Data Acquisition System uses ABB Kent-Taylor Modcell 2000 microprocessor controllers with a PC for operator interface.
Figure 2-1. Test Facility
Horiba PIR-2000 CO/CO2 Analyzer and Servomex Model 1440C1 CO/CO2/CH4 Analyzers This non-dispersive infrared analyzer (NDIR) automatically and continuously monitors the CO and CO2 concentrations. The theory of operation is based on the principle that both gases have a unique absorption line spectrum in the IR region. The instrument consists of an IR light source, a chopper, a measuring cell, and a two-chamber sealed detector. The IR light beam emitted by the source passes through a measuring cell that is filled with a continuously flowing gas sample. Before reaching the front chamber of the detector, the light beam is partially absorbed or attenuated by the gas species of interest in the cell. Both the front and rear chambers of the detector are filled with a reference gas. The difference in the amount of light absorbed between the front and rear chambers is dependent on the concentration of the gas species of interest within the measuring cell and creates a pressure differential between the two chambers. The pressure differential is then observed as gas flow by the microflow sensor located in the channel connecting the two chambers. The resulting AC signal from the sensor is rectified, amplified, and linearized into a DC voltage signal for output. TECO Model 10 NO/NOX Analyzer This analyzer automatically and continuously determines the concentration of the nitric oxide (NO) or nitrogen oxides (NOX) in the effluent. The analytical technique is chemiluminescence. The sample is routed through a converter where the NO2 is dissociated to form NO. The sample is then passed through a reaction chamber where the NO is quantitatively converted to NO2 by gas-phase oxidation with molecular ozone produced within the analyzer. In this reaction, the NO2 molecules are elevated to an electronically excited state and immediately revert to a non-excited ground state. This reversion is accompanied by the emission of photons, which impinge on a photomultiplier detector and generate a low-level DC current. The current is then amplified and used to drive a front panel meter and a data recorder. The NOX concentration seen by the instrument includes the contributions of both the NO in the sample and the NO resulting from the dissociation of the NO2 in the sample. Beckman Model 755 O2 Analyzer and Servomex Model 1440C1 O2 Analyzer This analyzer was designed specifically to measure O2 in flue gas streams. It utilizes the magnetic susceptibility of O2 by passing it through a strong, non-linear magnetic field. As it responds to the magnetic field, the O2 displaces a detector located in the analyzer's measurement cell. The degree of displacement is proportional to the concentration of O2 in the sample. An electrical circuit wired into the detector provides a signal output of 0 to 25% O2. MSA Thermatron Thermal Conductivity Analyzer Operation of the Thermatron is based upon the effect of a gas sample upon the temperature of a heated wire filament. The filament is placed within a cylinder well of a cell block and is one arm of a Wheatstone bridge circuit. The filament is heated, and heat is lost to the cell walls at a rate depending upon the thermal conductivity of the gas. A change in concentration of the gas changes the rate of heat loss and upsets the bridge circuit, resulting in an analog signal proportional to the concentration of the component of interest. Data Acquisition System The DAS consists of an ABB process controller for data acquisition and a Pentium-based PC with a 5 GB hard drive for data storage. The software for data display and collection is Intellution. Data are collected from the various instruments (H2, CO, CO2, CH4, NOX, O2, temperature of the sample gas, and rate of gas being sampled) via an ABB Modcell 2000 process control and data acquisition system. Data are collected from each channel at the rate of once per second and communicated to the PC. The data are stored in a format that can be imported into an Excel spreadsheet for data analysis and graphing. The DAS uses a DELL portable computer with a 20 MB hard disk and a strip chart recorder/analog-to-digital converter. In addition to providing an instantaneous display of analyzer responses, the DAS compiles the analyzer data collected once each second and averages them. The DAS integrates the real-time measurements and provides printouts of averaged emissions over any time period desired. Continuous emission monitors will be operated for NOx, CO, CO2, O2, CH4, and H2. The following QA/QC criteria will be implemented for NOx, CO, CO2, and O2 as discussed in the applicable federal register methods. Instrument calibration/linearity will be required to be correct within 2% of full scale. Zero and calibration drift will be limited to 3% of full scale. Sampling system bias will be limited to 5% of full scale. These QA/QC criteria should be met in most cases. CEM calibration will consist of gases at three concentration points: zero %, ~80% of span and ~ 40% of span. Calibration drift and system bias checks will be done twice daily. 3.2 Analytical Methods
4.1 Bias, Precision, and Completeness The data quality indicator goals (DQIGs) are specific criteria used to quantify how well the collected data meet the appropriate data quality objectives. The DQIGs for bias, precision, and completeness (defined below for the critical measurements) are listed in Table 4-1. Bias - The degree of agreement between an average measurement and an accepted reference or true value, expressed as a percentage of the reference or true value. Accuracy DQIG must include systematic errors associated with the sampling process.
Precision - Expressed as percent relative standard deviation (RSD), it can be determined using the formula:
Completeness- Expressed as percent acceptable data collected, using the expression:
Compliance with the DQIG for accuracy of the continuous emission monitors (CEMs) will be assessed by introducing a span gas through the entire sampling system on at least one occasion to allow for comparison between the measured value and the manufacturer's stated value. Precision of the CEM measurements will be assessed by calculating the relative standard deviation of replicate measurements of calibration gases of known concentration. 4.2 Comparability Comparability evaluates the degree to which the collected data can be compared with measurements of similar parameters at similar locations or from similar systems. All test data that satisfy the data validation criteria will be compared consistently with the reference methods used or with the procedures and standard units derived and agreed upon during the finalization of this QAPP. The test data are representative of this unique experimental research site and are not directly comparable with other gas turbines. 4.3 Internal QC Checks To ensure sampling reproducibility, replicate tests will be conducted as needed. All reagents will be of a reagent or pesticide grade. All information not recorded on standardized data sheets will be recorded in a bound project notebook. Samples generated in the field will be labeled. Integrity of the samples will be maintained by using proper chain-of-custody procedures. A single field blank will be prepared for the EPA Method 5/29 (particulate/metals) train. It will be analyzed along with actual samples to access bias in train preparation and cleanup. The same applies to a reagent blank. Analytical laboratory QC samples will be treated according to EPA Methods 5 and 29. QC checks on the GC and CEMs will be treated according to EPA Method 6C. 4.4 Corrective Action The predetermined limits for data acceptability are listed in Table 4-1. If these limits are exceeded, corrective action will be taken. This action may be a notation in the final report, recalibration of a particular instrument, a repeat analysis, or, in extreme cases, the repeat of an entire test. Therefore, the Work Assignment Leaders judgment will be important in corrective action initiation. In this judgement, the Work Assignment Leader will be guided by the relative importance of a given measurement to the overall test objectives, and the degree to which the data quality limits have been exceeded. All staff members are responsible for reporting any identified QA problems to the Work Assignment Leader. The Work Assignment Leader will be responsible for approving and/or ensuring the performance of the corrective action.
TABLE 4-1. Data Quality Indicator Goals for Critical Measurements
N2 and CO co-elute and may not be quantifiable Completeness goal for all measurements is 90% 5.0 DATA REDUCTION, VALIDATION, AND REPORTING 5.1 General Principles Concentrations of analytes will be calculated according to the equations in the analytical methods cited. Outliers will be identified as those falling outside of the predetermined DQIG limits. Because of the nature of these studies, it is unlikely that any data will be omitted. Any outliers will be characterized to the fullest extent possible and identified as such. Whenever possible, analyses revealing outliers will be repeated. All data will be compiled and reported by the ARCADIS Work Assignment Leader. 5.2 Data Reduction For the CEMs, the data acquisition system logs all analyzer data and the computer software allows for various forms of data reduction. For the manual methods, the collected data are hand-input into Excel spreadsheets designed to reduce the data. CEM data will be plotted as pollutant concentration vs. time. Particulate and metals data will be presented in terms of concentration and emission rate (lb/hr). 5.3 Data Validation After completion of the manual-methods hand-generated data inputs, all entries will be double-checked by the Sampling Engineer against the raw field data sheets for accuracy and completeness. CEM data will be reviewed for abnormalities or anomalies, prior to reporting. Laboratory reports will be reviewed to ensure that the reported data are qualified by the appropriate QA/QC information. 5.4 Data Reporting Project progress will be reported to EPA in monthly progress reports and a final data report. The monthly progress report will be financial. Sampling data will be reported in the form of spreadsheets showing gaseous pollutant concentrations vs time and particulate and metals results in terms of concentration and emission rate (lb/hr). The following EPA Methods will be used as references for these tests. These methods are included as Appendix A to this QAPP.
APPENDIX A STANDARD METHODS EPA Methods may be found on the internet at: http://www.epa.gov/ttn/emc/promgate.html
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||